06 · Inforlary Services

Integration and API

Connecting ERP, CRM, e-gov and third-party systems.

If data still moves between systems by hand, I build the integration. Contracted APIs, event flows, failure and retry policy get written down. The aim is for teams to stop bridging with email and spreadsheets.

Scope

What sits under this engagement

06.01

Inventory and contract

Source / target systems, field mapping, ownership and SLA. Paper first, then code.
06.02

APIs and events

REST / webhook / queue. Versioning and backward-compatibility plan.
06.03

Failure and retry

Timeouts, idempotency, dead-letter. It should not fail quietly at midnight.
06.04

Monitoring

Success rate, latency, alerts. The ops board is part of the integration.

Ask for a scope Back

Service experience

More from the same service domain

Send the brief